Manufacturing
Work-in-process, tools, quality gates and line-side material.
Work-in-process, kits, line-side containers, tools and station states.
Metal, liquids, sequence changes and a raw read being mistaken for process completion.
Test one station transition with expected, missing and out-of-sequence items and its MES/ERP response.
CONTEXT WORKFLOW
- 01Identify the work unit
Tie a container, kit, work order or tool to the station context that will own the next transition.
- 02Confirm station arrival
Check that the expected unit reached the station or buffer instead of treating every nearby observation as process completion.
- 03Apply the process rule
Validate sequence, quality hold and material conditions before allowing the next state to be posted.
- 04Escalate the hold
Make missing, wrong or out-of-sequence material visible to the operator and the process owner.
STARTING COMPONENTS
- Industrial or on-metal tag construction
- Fixed reader at a defined station or buffer
- Handheld reader for exception investigation
- MES or ERP event connector
SYSTEM HANDOFF
Manufacturing integration should carry work context, station, state and hold reason to MES or ERP without turning raw reads into automatic completion.
